This fall we began the removal of pre-load sand for our new Phase 3 Condo Building at 5011 Springs Boulevard. In the months leading up to this, we placed 6 meters of pre-load sand weighing about 25,000,000 lbs to ensure …
Posted in Construction Updates | Leave a commentActive living is the name of the game at Tsawwassen Springs. The development’s main attraction is, of course, the new golf course, featuring 18 holes with a natural twist. Course designer Ted Locke was brought on board to design a …
Posted in Golf | Leave a comment